1
/
of
2
PRS SE
PRS SE G&B 85/15 Bridge Humbucker | SP-8515-TNU, Long Lead
PRS SE G&B 85/15 Bridge Humbucker | SP-8515-TNU, Long Lead
Regular price
$35.00 USD
Regular price
Sale price
$35.00 USD
Unit price
/
per
This is a one-of-a-kind, pre-owned item. Once it’s sold, it’s gone — and I can’t predict if or when I’ll get another. Be sure to check out my currently available inventory to see if something else might work for you. Thanks!
Couldn't load pickup availability
Here's a PRS SE 85/15 SE humbucker from a PRS SE guitar for the bridge position. Stamped "F" for Front indicated a neck pickup with 50mm spacing.
- 8.89 kΩ DCR
- 11" of 4-Conductor Shielded Lead Length
- Screw Coil - South
- Slug Coil - North
- Meters "DOWN"
No Mounting Hardware Included. Very clean overall with light playing wear.
Share
